  1. Pull-based and push-based supply chain models are two supply chain strategies commonly adopted by companies.
    (a) What is the pull-based supply chain model? What is the push-based supply chain model? (8 points)
    (b) What are the advantages of the pull-based supply chain model? What are the advantages of the push-based supply chain model? (8 points)
    (c) When a company decides which supply chain model to adopt, what factors need to be considered by the focal company? Please list and explain some company-specific, industry-level, and business-environment-level factors that should be considered when deciding the best supply chain model for a company (10 points)

登入後即可作答並保存紀錄。

這一題的完整詳解

此題主要在探討供應鏈管理中的兩種核心策略:推式(Push)與拉式(Pull)供應鏈模型,並要求分析其優勢及選擇時的考量因素。

(a) 推式與拉式供應鏈模型定義

  • 拉式供應鏈模型 (Pull Supply Chain Model):
    此模型的核心理念是「需求驅動」。生產與庫存的啟動不是基於預測,而是基於實際的客戶訂單。當客戶發出訂單時,才會觸發生產流程,並依據訂單數量從上游採購原物料。

    • 運作方式: 產品的生產與運送流程由最終客戶的需求所「拉動」。
    • 特點: 庫存量較低,生產彈性高,能快速回應市場變化。
    • 適用情境: 需求變化劇烈、產品客製化程度高、或產品生命週期短的產業。
  • 推式供應鏈模型 (Push Supply Chain Model):
    此模型的核心理念是「預測驅動」。生產與庫存的決策基於對未來市場需求的預測。公司會根據預測的銷售量來規劃生產、採購原物料,並將產品庫存推向通路。

    • 運作方式: 產品的生產與運送流程由企業的生產計畫所「推送」。
    • 特點: 能夠利用規模經濟降低生產成本,確保產品的可用性,但可能面臨庫存積壓或缺貨的風險。
    • 適用情境: 需求相對穩定、產品標準化程度高、或需要提前規劃產能的產業。

(b) 推式與拉式供應鏈模型的優勢

  • 拉式供應鏈模型的優勢:

    1. 降低庫存成本: 由於生產與採購是基於實際訂單,能有效減少過量的庫存,進而降低倉儲、管理及報廢的成本。
    2. 提高客戶滿意度: 能夠更精確地滿足客戶的特定需求,特別是客製化產品,減少因庫存不符而產生的延誤或不滿。
    3. 快速回應市場變化: 由於生產彈性高,當市場需求或偏好改變時,能較快地調整生產計畫,減少因預測失準造成的損失。
    4. 減少過時庫存: 對於產品生命週期短或容易過時的產品,拉式模型能顯著降低因產品過時而產生的損失。
  • 推式供應鏈模型的優勢:

    1. 規模經濟與成本效益: 透過大規模生產,可以充分利用固定資產,降低單位生產成本,並在採購原物料時獲得議價優勢。
    2. 確保產品可用性: 預測性的生產能夠確保產品在市場上隨時有足夠的庫存,滿足消費者即時購買的需求,避免因缺貨而流失訂單。
    3. 供應鏈效率: 穩定的生產計畫有助於更順暢地規劃物流、倉儲及人力資源,提高供應鏈整體運作效率。
    4. 易於管理: 相較於需要即時回應的拉式系統,推式系統在規劃與管理上相對較為簡單,特別是對於成熟且需求穩定的產品。

(c) 選擇供應鏈模型的考量因素

當公司決定採用何種供應鏈模型時,需要綜合考量多方面的因素,以下分為公司內部、產業及外部環境三個層次:

  1. 公司內部因素 (Company-Specific Factors):
    • 產品特性 (Product Characteristics): 產品的生命週期長短、客製化程度、體積、重量、易損性、價值(高單價或低單價)等。例如,高單價、客製化產品較適合拉式,標準化、低單價產品較適合推式。
    • 需求變異性 (Demand Variability): 市場需求是穩定還是劇烈波動?
🔒

後續完整解題步驟與【答案】

免費註冊,享三天全站完整詳解閱覽。

免費註冊

第 2 題

  1. Assume that a leading bicycle-manufacturing company is currently evaluating two IT investment projects. The first IT investment project (called Mfc-BDA) is to develop a manufacturing big data analytics system for improving the manufacturing productivity and reduce defects in the manufacturing process. The second IT investment project (called Bike-IoT) is to explore the use of Internet of Things (IoT) technology to record riders' riding habits and monitor bikes' status (e.g., tire pressure) so that riding experiences and safety of riders can be enhanced.
    Clearly, these two IT investments, like any other IT investment projects, will involve firm-specific, competition, and market risks. Please answer the following questions.
    (a) Please list two potential markets risks that the Mfc-BDA project is likely to face. Please explain what these two market risks are and why they will undermine the benefit of the Mfc-BDA project to this bicycle manufacturing company. (8 points)
    (b) What are the competition risks that the Bike-IoT project may be exposed to? How this bicycle manufacturing company should do in order to minimize these competition risks? (8 points)
    Which type of risks (firm-specific risks, competition risks, or market risks) is more critical to the Mfc-BDA project? In other words, which type of risks should the focal company attempt to control so as to improve the likelihood that this IT investment project will succeed? (8 points)

登入後即可作答並保存紀錄。

這一題的完整詳解

此題探討 IT 投資專案中可能面臨的風險,特別是市場風險、競爭風險,以及如何評估風險的關鍵性。

(a) Mfc-BDA 專案的市場風險

Mfc-BDA 專案旨在建立製造大數據分析系統,以提升生產力及降低製程缺陷。此專案面臨的市場風險可能包括:

  1. 市場接受度風險 (Market Acceptance Risk):

    • 風險說明: 即使技術可行且預期能改善生產,但市場(包含內部使用者如生產部門,或外部供應鏈夥伴)可能不願意採用或信任該系統產生的數據分析結果。例如,生產線操作人員可能對新系統產生抵觸,或管理層對大數據分析的價值持懷疑態度,導致系統未能被充分利用。
    • 為何會損害效益: 若系統的使用率低,或分析結果被忽略,則無法實現提升生產力、降低缺陷的目標。專案的投資效益將大打折扣,甚至無法回收。
  2. 市場需求轉變風險 (Market Demand Shift Risk):

    • 風險說明: 專案的效益很大程度上依賴於當前製造流程的效率與良率。然而,市場對自行車產品的需求、技術標準或客戶偏好可能發生劇烈變化。例如,消費者突然轉向對某種新型態自行車(如電動輔助自行車)的需求激增,或環保法規要求改變生產製程,使得現有的大數據分析系統所關注的生產面向變得不再那麼關鍵。
    • 為何會損害效益: 如果市場需求或產品方向突然改變,Mfc-BDA 系統所優化或分析的生產環節,可能不再是公司最優先的投資領域,或是其效益的相對重要性降低。例如,若公司需緊急轉向生產電動自行車,原先針對傳統自行車生產線優化的數據分析系統,其價值將大不如前,難以支撐整體公司策略的轉變。

(b) Bike-IoT 專案的競爭風險與最小化策略

Bike-IoT 專案旨在利用物聯網技術監測騎乘習慣與自行車狀態,以提升騎乘體驗與安全。

  • 競爭風險:

    1. 模仿者風險 (Imitation Risk): 競爭對手(其他自行車製造商、零配件供應商,甚至新創科技公司)可能快速複製或改進 Bike-IoT 的功能,推出類似甚至更優越的產品,瓜分市場。
    2. 技術標準被壟斷風險 (Technology Standard Dominance Risk): 若市場上出現一個主流的 IoT 數據標準或平台,而公司未能及早參與或遵循,其產品可能難以與其他系統整合,或失去與第三方服務(如保險、健康App)連結的機會,處於不利地位。
    3. 服務差異化流失風險 (Service Differentiation Loss Risk): 競爭對手可能提供更具吸引力的加值服務(如更精準的騎乘分析、社群互動功能、個人化保養提醒),使 Bike-IoT 的服務優勢無法維持。
    4. 數據安全與隱私競爭 (Data Security and Privacy Competition): 若競爭對手在數據安全與用戶隱私保護方面做得更好,更容易贏得消費者信任,尤其是在收集敏感的個人騎乘數據時。
  • 最小化競爭風險的策略:

    1. 快速創新與差異化 (Rapid Innovation and Differentiation): 持續投入研發,不斷推出新的、獨特的 IoT 功能與服務,保持技術領先地位,讓競爭對手難以追趕。例如,整合 AI 進行更深入的騎乘分析、預測性維護,或開發獨特的社群互動功能。
    2. 建立生態系與合作夥伴關係 (Build Ecosystem and Partnerships): 與其他公司(如運動 App 開發商、健康保險公司、地圖服務商、維修服務商)建立合作夥伴關係,擴大服務範圍,形成網絡效應,增加用戶黏著度。
🔒

後續完整解題步驟與【答案】

免費註冊,享三天全站完整詳解閱覽。

免費註冊

第 3 題25 分

  1. Artificial Intelligence (AI) enables the creation of new branches of intelligent software systems. For example, the virtual makeup try-on tools allow users to narrow their selection before physically trying makeup products. Another example is the automatic form-filling component that converts hand-filled application forms to electronic records. At the core of these AI-enabled systems are deep-learning models that drive the overall process. One critical issue is the maintenance of deployed deep learning models embedded in these systems. What are the steps to maintain deployed models? What are the factors that may affect model maintenance? (25 points)

登入後即可作答並保存紀錄。

這一題的完整詳解

此題主要探討部署後深度學習模型的維護問題,包含維護步驟以及影響維護的因素。這屬於機器學習維運 (MLOps) 的範疇,強調模型在實際應用中的生命週期管理。

部署後深度學習模型的維護步驟 (Steps to Maintain Deployed Deep Learning Models)

模型的維護並非一次性工作,而是一個持續的循環過程,確保模型在部署後仍能維持效能並適應變化。主要步驟包括:

  1. 模型效能監控 (Model Performance Monitoring):

    • 目的: 持續追蹤模型在實際生產環境中的表現,偵測效能衰退的跡象。
    • 監控指標: 準確度 (Accuracy)、精確率 (Precision)、召回率 (Recall)、F1 分數、AUC (Area Under the Curve)、損失函數值 (Loss Function Value) 等,針對特定應用場景選取合適的指標。
    • 方法: 建立自動化監控系統,定期(如每小時、每天)或基於事件觸發,收集模型預測結果與實際結果(若可獲取)進行比較。
  2. 數據漂移偵測 (Data Drift Detection):

    • 目的: 監測輸入模型的數據分佈是否與訓練時的數據分佈發生顯著差異。數據漂移是導致模型效能衰退的主要原因之一。
    • 類型:
      • 特徵漂移 (Feature Drift): 輸入特徵的統計分佈(如平均值、標準差、類別頻率)發生變化。
      • 概念漂移 (Concept Drift): 輸入特徵與目標變數之間的關係發生變化。
    • 方法: 使用統計檢定方法(如 Kolmogorov-Smirnov test, Chi-squared test)、距離度量(如 Wasserstein distance)或專門的漂移檢測演算法來比較訓練數據與生產數據的特徵分佈。
  3. 模型再訓練與更新 (Model Retraining and Updating):

    • 目的: 當監測到模型效能下降或數據漂移顯著時,利用新的數據重新訓練模型,以恢復或提升其效能。
    • 觸發條件:
      • 效能指標低於預設閾值。
      • 偵測到嚴重數據漂移。
      • 定期(如每季、每年)的計劃性再訓練。
      • 出現重大外部事件(如新的疫情爆發、市場規則改變)。
    • 再訓練策略:
      • 全量再訓練 (Full Retraining): 使用所有歷史數據(包括新數據)重新訓練模型。
      • 增量學習 (Incremental Learning) / 遷移學習 (Transfer Learning): 在現有模型基礎上,僅使用新數據進行微調,或在保留部分舊模型結構的同時,僅重新訓練部分層。
  4. 模型版本管理與部署 (Model Versioning and Deployment):

    • 目的: 確保每次模型更新都有明確的版本記錄,並能安全、高效地將新模型部署到生產環境,同時具備回滾機制。
    • 方法: 使用模型註冊表 (Model Registry) 來追蹤不同版本的模型、訓練參數、評估結果。部署時採用藍綠部署 (Blue-Green Deployment)、金絲雀部署 (Canary Deployment) 等策略,以最小化對線上服務的影響。
  5. 日誌記錄與審計 (Logging and Auditing):

🔒

後續完整解題步驟與【答案】

免費註冊,享三天全站完整詳解閱覽。

免費註冊

第 4 題

  1. Estimating the costs of a software system is essential for a meaningful plan. Popular methods include function point analysis, COCOMI II, expert judgment, planning poker, and T-shirt sizing. Please answer the following questions.
    (a) Briefly explain these approaches (10 points)
    (b) Compare the optimal timing and usage of these approaches in terms of the Systems Development Process Model. (15 points)

登入後即可作答並保存紀錄。

這一題的完整詳解

核心觀念
本題測驗考生對軟體成本估算的主要方法及其在系統開發流程(SDLC)中適用時機的理解。關鍵在於掌握每種方法的原理、適用條件與估算精度,以及如何根據開發階段選擇最適合的技術。


(a) 各估算方法簡述(10 分)

方法原理與步驟主要特性
Function Point (FP) 分析1. 依功能需求將系統分為 External Input (EI)、External Output (EO)、External Inquiry (EQ)、Internal Logical File (ILF)、External Interface File (EIF) 五類。<br>2. 依類別與複雜度(低/中/高)給予加權值,計算未調整功能點(UFP)。<br>3. 乘上 VAF (Value Adjustment Factor)(0.65–1.35)得到調整後功能點 (AFP)。<br>4. 以歷史生產率(人‑月 / FP)轉換為工作量。- 依功能需求而非程式碼行數,早期可用於需求分析階段。<br>- 受需求變更影響較小,適合大型資訊系統。
COCOMO II1. 確定產品規模 SizeSize(千源程式行 KLOC 或 FP 轉換)。<br>2. 計算 Exponential factor E=B+0.01∑_i=15SFiE = B + 0.01\sum\_{i=1}^{5}SF_i(5 個尺度因子)。<br>3. 計算 Effort: Effort (人‑月)=A×SizeE×∏_i=1nEMi\text{Effort (人‑月)} = A \times Size^{E} \times \prod\_{i=1}^{n} EM_i <br>其中 AA、BB 為基礎常數 (常見 A=2.94,  B=0.91A=2.94,\;B=0.91), EMiEM_i 為 17 個努力乘數。<br>4. 依 Effort 計算開發時間 T=C×EffortFT = C \times \text{Effort}^{F}(CC, FF 為常數)。- 基於統計模型,適合已有相似專案歷史資料的情境。<br>- 可在規劃、設計階段進行 細部 調整。
Expert Judgment (專家判斷)召集具備相似專案經驗的領域專家,採用 Delphi 或 Wideband Delphi 方式,收集、彙整各專家估算值,取平均或加權後得出最終估算。- 依賴人力與經驗,快速取得粗估。<br>- 受主觀偏差影響大,需多位專家降低誤差。
Planning Poker1. 開發團隊(通常 5–7 人)依每個使用者故事(User Story)或功能點,在撲克牌上選擇估算值(常用斐波那契數列 1、2、3、5、8、13、…)。<br>2. 同時亮牌,若差異大則討論原因,重複直到共識。- 以 Story Point 表示相對工作量,適用於 敏捷迭代(Sprint)規劃。<br>- 可即時捕捉需求曖昧與技術風險。
T‑shirt Sizing為每項需求或功能分配 XS、S、M、L、XL 五個尺寸,對應大致的工作量或複雜度。尺寸可再映射至人‑週或 Story Point。- 極簡化的粗估方式,常於 需求梳理會議(Backlog Grooming)使用。<br>- 便於非技術利害關係人快速理解。

(b) 各方法在系統開發流程模型中的最佳時機與使用方式(15 分)

開發階段(SDLC)典型任務推薦估算方法使用目的與說明
1. 可行性分析 / 初始規劃探討專案是否值得投入,制定概算與投資回報Expert Judgment、T‑shirt Sizing透過專家快速給出 概念性 成本範圍;T‑shirt 為利害關係人提供易懂的概念圖,協助決策層快速判斷。
🔒